Facts and Figures about the Ribble LinkFundingPredicted cost £5.4M Funded by:
Projected DatesOfficial launch of the project: 27th November 2000
DimensionsLength 5.3 Km - 3.3 Miles
StatisticsNumber of locks: 9
Flood ControlThe navigation is designed to accomodate a 1 in 50 year flood by means of flood control banks and bypass channels.DistancesFrom the Ribble Link Navigation to:
LocksLength: 22 m - 72 feetWidth: 4.27 m - 14 feet 3 inches Draught: 1.2 m - 4 feet Air Draught: 2.44 m - 8 feet Level on the Lancaster Canal: 20.8 m - 68 feet above ordnance datum. Level at lock 1: 2.7 m - 9 feet above ordnance datum. Drop in water level: 18.1 m - 59 feet Note that the locks on the Rufford Branch are shorter, at only 62 feet, than those on the rest of the Leeds and Liverpool Canal. |
||||||||||||||||||||||||||||||||||||||||||||